Skip to content
← All services

Basement Finishing.

Turn unfinished square footage into the suite, theater, or office you actually need.

Typical timeline
6–12 weeks
Estimates
Free, on-site
Service area
Denver metro
What's Included

Full-scope, in-house.

  • Moisture assessment & waterproofing tie-in
  • Egress windows where required
  • Framing & insulation
  • Bathrooms & kitchenettes
  • Flooring (carpet, vinyl, polished concrete)
  • HVAC zone integration
  • Built-ins & media walls
How estimates work

Every project gets
a real walkthrough.

We don't publish set prices because every home is different. An honest quote starts with us walking your space — and giving you a fixed-price proposal after the design phase. No online calculator can capture the structural details that drive cost.

Step 01

Discovery call

A 20-minute call to understand what you're thinking, your timeline, your range. Free, no pressure.

Step 02

Free on-site visit

We come to you, walk the space, take measurements, and ask the questions other contractors miss. Usually within the week.

Step 03

Written proposal

3–5 business days later, a detailed scope and fixed-price proposal — itemized, transparent, no allowances larger than they need to be.

FAQ

Common questions.

How long does it take to finish a basement? +
6–12 weeks depending on size and whether we are adding bathrooms or egress.
Do we need egress windows? +
Yes — required for any sleeping room. We cut, install, and pass inspection.
What about waterproofing? +
We start with a moisture assessment. Any active water issues are addressed before framing — non-negotiable.
Can you add a kitchenette or full bath? +
Yes — both. Plumbing rough-ins are easier in unfinished basements, so this is a great time to add a full kitchen or in-law suite.
Start Your Project

Ready to start your basement finishing project?

Tell us about your project and we'll get back to you within one business hour with next steps.